Geoff McGrath 15 July 2021

Smart data can support local authorities in the rollout of electric vehicle charge points

Smart data can support local authorities in the rollout of electric vehicle charge points image

Supporting the growth in demand for electric vehicles (EVs) continues to be a central challenge for local authorities in the fight for cleaner air and reduced carbon emissions. Despite the success of new initiatives such as the recent involvement of the Energy Saving Trust in helping to make both fleet and private vehicles more cost efficient, the specter of inaccessibility and hindered consumer confidence remains. Perennial risks of ‘charging blackspots’ emerging in small towns and rural areas mean that unless the rollout of new charge points is able to match the pace of consumer demand, we risk compromising our mission to ban the sale of fossil fuel-powered vehicles by 2030 and slowing our overall progress on the road to net zero.

To succeed, local authorities need the confidence to install charge points en masse in the right locations both to demonstrate economic viability in the long term and to ensure swathes of the population are not left behind.

Predictive analytics as a driver of progress

Predictive analytics technology combined with mobility and network data can help local authorities to achieve their sustainability goals by mapping out risks and opportunities that are crucial in determining the success of this mission. Often used for real-time analysis or long-term forecasting, mobility data can enable users to plan and understand future travel scenarios through insight into aggregated patterns of behaviour. Combined with predictive analytics, it can indicate key commuter routes in towns and cities and help pinpoint which areas are likely to experience a quicker EV uptake before the network is embedded.

Leveraging this data in real-time can help local authorities to rollout charging infrastructure with a near-complete view of satisfying end-user demand and delivering on the specific needs of the communities they represent. The insight provided by predictive analytics can also assist local authorities with deploying EV charge points in areas likely to drive a positive return on investment (ROI).

Deploying real-time data modeling enabled by predictive analytics means that local and planning authorities can better understand and leverage usage information. This means they can generate smarter, more flexible planning cycles that can account for evolving trends such as reduced demand during off-peak hours. Such trends become more insightful when integrated with additional system data meaning that those responsible for demand-side planning can adopt a more holistic approach to catering for EV demand.

Securing a balanced rollout

As well as helping to rollout EV charge point infrastructure at pace, predictive analytics can enable local authorities to take targeted approaches to investment that deliver on the needs of local communities. Existing data has already been proven capable of identifying which demographics are likeliest to invest in EVs (18–24-year-old ‘white collar’ workers) and can be integrated into wider transportation planning. This means that areas with a higher proportion of older residents or low vehicle ownership for instance can receive targeted investment in local transport such as bus services.

The integration capabilities of predictive analytics can also enable local authorities to collaborate more freely between other stakeholders. Sharing mobility data with charge point operators, estate managers and industry developers can help target investment in rural areas more efficiently and reduce the risk of repeating the past mistakes of ‘rural blackspots’ seen with the rollout of fiber optic broadband. In a time where local authorities are facing steep financial deficits caused by the pandemic, the opportunity for predictive analytics to provide enhanced accessibility and deliver a positive return on investment is to be seized upon.

Moving forward

Just as local authorities are looking for innovative new ways of delivering a green recovery from the pandemic, predictive analytics can help plug the accessibility gap and deliver positive change for all communities. The rollout of EV infrastructure is not the panacea to our climate woes, but it is a step in the right direction. Just as permitted development rights are starting to favour the mass rollout of charge point infrastructure and enhanced resources are coming through from the involvement of the Energy Savings Trust, local authorities can set the national standard on the EV rollout. By making use of data, we can demonstrate our commitment to targeted development, ensuring that we develop equitably, fairly, and sustainably.

To find out more, click here.

Geoff McGrath is managing director at CKDelta

SIGN UP
For your free daily news bulletin
Highways jobs

Procurement & Contracts Officer - Epping Council

Essex County Council
Up to £21.0100 per hour
Procurement & Contracts Officer - Epping Forest District Council Epping, EssexFull-Time, Temporary - 37 Hours per Week 2-3 Month Contract £21.01 PAYE England, Essex
Recuriter: Essex County Council

Commercial and Operations Manager

Mansfield District Council
£12,098 - £13,756 per annum
This is a part-time opportunity, working alongside a part-time fellow manager of the same title. Mansfield, Nottinghamshire
Recuriter: Mansfield District Council

Plumber/Gas Fitter

Mansfield District Council
£32,373, per annum plus £484 tool allowance
We have an exciting opportunity to join our Housing Repairs Team Mansfield, Nottinghamshire
Recuriter: Mansfield District Council

Highway Asset Manager (Contracts)

Devon County Council
£58,310 per annum
Are you experienced in delivering large-scale infrastructure programmes that keep communities connected and safe? Devon
Recuriter: Devon County Council

Senior Care and Housing Support Officer

Sandwell Metropolitan Borough Council
Band D, SCP 9 -17 (£27,254 - £31,022 per annum)
Are you enthusiastic about making a difference in the lives of older adults? Sandwell, West Midlands
Recuriter: Sandwell Metropolitan Borough Council
Linkedin Banner