30 July 2024

Ensuring packaged pump stations meet utility standards

Ensuring packaged pump stations meet utility standards image

Large housing developments that cannot connect to the main sewer by gravity, require packaged pumping stations to perform the vital task of safely removing wastewater. They must be designed to water company standards and here, Helen Wilson, industry & infrastructure UK manager at Xylem UK, answers the questions developers may ask before selecting a pumping station.

What is a packaged pumping station?

Packaged pumping stations (PPSs) are factory-built systems that pump wastewater and stormwater from a site into the public sewer network for treatment and disposal.

Does my development require a packaged pumping station?

The systems are typically used where a development cannot connect to the public sewer system by gravity. It may be situated below the network, in a remote or inaccessible location, or is a considerable distance away from the main sewer, making a traditional gravity-based system unfeasible or not cost effective.

Do I need to liaise with the local water company before installation?

If you are constructing sewers or pumping stations as part of a new development, it is advisable to apply for an S104 connection in the design phase of a new project. This process allows the local water company to adopt the new sewerage system under Section 104 of the Water Industry Act 1991. By doing so, you ensure that your development complies with industry standards and that the sewer network is properly integrated into the existing infrastructure.

The station design and installation must comply with the industry’s Sewage Sector Guidance (SSG), a suite of documents that sets out adoption requirements including for location, size, pipework, valve layout, pump types, level and control specifications. The SSG was introduced in April 2020, replacing the Sewers for Adoption guidance.

How long will it take to install a packaged pumping station?

PPSs are pre-assembled units which are delivered to site fully kitted-out with components including pumps, pipes, valves and controls. This means the installation process is simple and can be arranged to suit programmes work, saving onsite build-time and reducing disruption.

Xylem’s Flygt brand offers a comprehensive range of packaged pumping stations which it aims to specify, price and supply within four to six weeks. To avoid any site-specific issues, Xylem engineers will work with the developer to clarify details such as, where will the station be situated? Does it have clear access? Has the correct access cover been specified? And, importantly, has a groundwater survey been carried out?

Who will be responsible for the management and maintenance of the pumping station once installed?

Water companies and New Appointments & Variations (NAVs) - limited companies selected to run water and sewerage services in specific geographic areas, are recognised as the most suitable owners of sewerage networks. Once satisfied the pumping station has been completed to the agreed standard, the utility will adopt the asset and take over its management.

Before this can happen, a pre-adoption onsite inspection is usually carried out to ensure all works have been completed as per the design. Representatives from the water company, the developer and, where Xylem is the supplier, a member of its engineering team are all involved.

As a turnkey service provider, Xylem offers developers a pre-adoption advisory service and full technical submission to be used to apply for a S104 legal agreement.

Are packaged pumping stations easy to maintain?

The right packaged pumping station will provide efficient and reliable pumping for new housing, from single dwellings through to major developments. Models with high-end pumps will provide decades of service and, in the long-term, be more efficient than alternatives such as septic tanks or onsite treatment units.

Xylem’s engineers advise at least one service visit per year to lift and check the electrical pumps. If the station is found to receive large volumes of unflushable items, such as wet wipes and nappies, they would recommend up to four visits per year.

Are smart pumping stations now available?

As urbanisation increases and developments expand into more remote and inaccessible areas, the need to efficiently pump wastewater to treatment works becomes an ever more crucial consideration. As such, the technology is becoming more intelligent to meet changing customer needs.

One example is the Flygt Concertor, which was the world’s first wastewater pumping system with integrated intelligence. The smart system is capable of sensing the operating conditions of its environment, adapting performance in real-time and providing feedback to operators.

SIGN UP
For your free daily news bulletin
Highways jobs

Assistant Traffic Management and Road Safety Engineer

North Yorkshire Council
£29,064 to £34,434 per annum
Are you interested in a career in traffic engineering and would love the opportunity to learn whilst you earn? Scarborough, North Yorkshire
Recuriter: North Yorkshire Council

Engineering Team Manager (Network Co-ordination)

Calderdale Metropolitan Borough Council
£53,460 - £56,732 per annum
We are looking for an enthusiastic and highly driven candidate to join our Highways Asset Management team at Calderdale Council. Calderdale, West Yorkshire
Recuriter: Calderdale Metropolitan Borough Council

Assistant Traffic Management and Road Safety Engineer

North Yorkshire Council
£29,064 to £34,434 per annum Grade
North Yorkshire Council
Recuriter: North Yorkshire Council

Building Control Officer

Wakefield Council
£28,598 - £46,142
We are looking to recruit an ambitious person who is interested in furthering their career in local government Wakefield, West Yorkshire
Recuriter: Wakefield Council

Assistant Manager (Technical Overview)

Wakefield Council
£35,412 - £38,220
The post holder will deputise for the General Manager and play a vital role in ensuring the smooth operations of Wakefield Exchange Wakefield, West Yorkshire
Recuriter: Wakefield Council
Linkedin Banner