07 December 2015

Alumasc

Alumasc's Euroroof Caltech waterproofing system has been installed on the roofs at California House, providing a significant increase to the operational life of this 42-flat retirement/sheltered housing complex in Bartley Green, Birmingham.

Owned by Birmingham City Council, Places Directorate, California House is a 10-storey, high rise residential block of flats. The existing roof system comprised Mastic asphalt with minimal thermal insulation, which had become heavily compromised. Multiple repairs had been previously undertaken to extend the serviceable life of the original roof.

Alumasc and their West Midlands-based registered contractor Brindley Asphalt were chosen to install a complete new roof waterproofing system on the 405m2 roof area, which would provide an effective long term solution.

What remained of the existing, now degraded, waterproofing system was completely removed and replaced by a new, fully integrated Alumasc solution.

The first stage was suitable preparation, onto which the contractor laid a Euroroof vapour barrier offering immediate protection for the fully occupied residence. A fully engineered Derbifoam thermal insulation scheme was then laid, which provided the target U-value of 0.18 W/m²Kd and removes standing water to the existing RWO locations. The internal rain water outlet locations were fully refurbished with the Euroroof Refurb Pro outlets.

Finally, Brindley Asphalt installed the Euroroof Caltech waterproofing system in a totally Flame Free and "cold applied" manner, comprising a Caltech base coat with reinforcement layer and two applications of the Caltech Top Coat, to achieve the 25-year System warranty.

The perimeter parapet details were fully encapsulated with the Euroroof Caltech waterproofing system and finished with Alumasc Skyline Aluminium PPC capping, in the client-selected RAL colour.

The installation of defined walkways, finished in the Euroroof Caltech Aggregated wear course, completed the total engineered solution to the entire roof covering.

Acivico Project Manager Glenn Jones, who managed the works on behalf of Birmingham City Council, Places Directorate, commented: "The quality of work on site and the attention to detail was of a very high standard".

Visit www.alumascroofing.co.uk or by call 0333 5771 500 for further information.

SIGN UP
For your free daily news bulletin
Highways jobs

Service Director - Finance

Isle of Wight Council
£95,212 to £102,389
We need a talented and experienced Service Director of Finance to join us and play a pivotal role Isle of Wight
Recuriter: Isle of Wight Council

Strategic Director of Finance and Deputy Chief Executive (Section 151)

Isle of Wight Council
£120,536 to £129,500
Strategic Director of Finance and Deputy Chief Executive (Section 151) Isle of Wight
Recuriter: Isle of Wight Council

Service Director - Education

Isle of Wight Council
£95,212 to £102,389
This is a great time to join our Children’s Services senior leadership team as a Service Director for Education where you’ll provide system leadership Isle of Wight
Recuriter: Isle of Wight Council

Class Teacher (Primary)

Durham County Council
£32,916- £51,048
Primary School Class Teacher M1-UPS3 (£32,916  - £52,149) Permanent, Full-time Contract to begin in September 2026.   The Governors of this happy and Durham
Recuriter: Durham County Council

SEND Inclusion Partner

Essex County Council
£44258.0000 - £52068.0000 per annum
SEND Inclusion PartnerPermanentPart Time, 22.2 hours per week£44,258 to £52,068 per annum FTE, £26,554.80 to £31,240.80 per annum (pro rata)Location
Recuriter: Essex County Council
Linkedin Banner