11 May 2021

Electric performance from the Ariens Zenith E

Electric performance from the Ariens Zenith E image

Ariens have introduced their first commercial, all-electric zero-turn mower for the UK market. The Zenith E is powered by a FusionCore lithium-ion battery system, an exclusive technology developed by Ariens. It is designed to provide the operator with a continuous cutting time of up to 5.5 hours on a full charge, and coverage of up to 62,726 sq/m (15.5 acres).

The Zenith E is built upon the fully commercial Ariens ‘Zenith’ platform, well known for its strength, durability and cutting performance. Combined with next-generation battery technology, the Zenith E is a formidable competitor to conventional commercial petrol and diesel zero-turns. It is one of the first battery-powered commercial zero-turn mowers developed by an outdoor power equipment company.

The Zenith E has all the power and performance of its petrol counterparts without the noise, vibration and exhaust. Coupled with the increased productivity of a zero-turn, it is perfect for commercial operators looking to capitalise on the growing number of ‘green’ contracts. Fully electric, the Zenith E’s FusionCore lithium-ion 56v DC battery system has four interchangeable, easily removable, sealed for life batteries, each with a 4kWh capacity. Operators can work with minimum interruption by swapping depleted batteries with fully charged ones in seconds.

Where a mix of charge levels is detected in the four batteries, the patent-pending management system prioritises how the Zenith E balances power. It will only draw from the full batteries until they reach the same level as those with less charge. Once all four are at the same charge level, the machine will draw power from them equally, thus ensuring consistent power and cutting performance throughout. The system is IP65 rated, sealed from moisture, dust and debris and is safe to use in wet conditions. Batteries can be charged in 12 hours with a standard charger or in just 5.3 hours using an optional quick charger.

The Zenith E features patent-pending spindle technology. This system is designed to protect the spindle motors from damage in the event the blade strikes a hard object, such as a manhole cover or large rock. The two proprietary hub and wheel electric motors work with a dual reduction planetary gearbox to produce an exceptional level of torque, providing the operator with the same feel and driving experience of a petrol zero-turn.

There are two configurations for the 152cm (60”) deck: side discharge and rear discharge. Both are fabricated from highly durable, 10-gauge steel. The Zenith E boasts 15 cutting positions, easily selected with a vertical pin drop and foot-operated deck lift system. The high-back, full suspension seat with padded armrests offers all-day operator comfort. The frame is an industry-leading design with large formed tubular steel chassis for durability.

The Rollover Protection System (ROPS) is fitted as standard. A range of optional accessories is available including LED lights, beacon light, mulch kit, rapid charger and an off-board charger. The Zenith E comes with a 5-year/1500 hour warranty with no hour limit on the first two years and a 3-year warranty for the batteries.

For further information, please e-mail zenithe@ariensco.com, call 01844 277035 or visit the website ariens-uk.com

Addressing regional inequalities  image

Addressing regional inequalities

Andrew Borland, Chief Innovation Officer at the Virtual Engineering Centre (VEC), University of Liverpool discusses the importance of levelling up for growth.
Banning urban pesticide use image

Banning urban pesticide use

RSPB and PAN are working on a letter from local councillors calling on the Government to introduce a national ban on urban pesticide use. Find out more below.
SIGN UP
For your free daily news bulletin
Highways jobs

Recovery Worker Substance Misuse

Essex County Council
£30931 - £35362 per annum + + 26 Days Leave & Defined Benefit Pension
Recovery Worker Substance MisusePermanent, Full Time£30,931 to £35,362 per annumLocation
Recuriter: Essex County Council

Principal Transport Officer

Old Oak and Park Royal Development Corporation
£63,112 per annum
leading the capital’s largest new regeneration project. Brent Civic Centre (32 Engineers Way, Wembley, HA9 0FJ).
Recuriter: Old Oak and Park Royal Development Corporation

Senior Occupational Therapist

Essex County Council
£43477 - £52302 per annum + Flexible Working, Hybrid, CPD, Gov Pension
The role will be responsible for supporting adults to develop their abilities to enable them to live as independently as possible. This may include England, Essex, Harlow
Recuriter: Essex County Council

Director of Commissioning and Performance

Northumberland County Council
£100,157 - £109,081
We are looking for an individual to help us achieve excellence in adult social care in Northumberland. Northumberland County Council, Morpeth, United Kingdom
Recuriter: Northumberland County Council

Payroll Manager

London Borough of Richmond upon Thames and London Borough of Wandsworth
£46,014 to £55,758 per annum
About the role You will have a set of on-going responsibilities which will vary depending on the needs of the team. The responsibilities include (but not limited to) to
Recuriter: London Borough of Richmond upon Thames and London Borough of Wandsworth
Linkedin Banner

Partner Content

Circular highways is a necessity not an aspiration – and it’s within our grasp

Shell is helping power the journey towards a circular paving industry with Shell Bitumen LT R, a new product for roads that uses plastics destined for landfill as part of the additives to make the bitumen.

Support from Effective Energy Group for Local Authorities to Deliver £430m Sustainable Warmth Funded Energy Efficiency Projects

Effective Energy Group is now offering its support to the 40 Local Authorities who have received a share of the £430m to deliver their projects on the ground by surveying properties and installing measures.

Pay.UK – the next step in Bacs’ evolution

Dougie Belmore explains how one of the main interfaces between you and Bacs is about to change.