Chris Ames 26 July 2024

ULEZ working even better than expected, Khan says

ULEZ working even better than expected, Khan says image
Image: Svet foto / Shutterstock.com.

City Hall has said the controversial expansion of Ultra Low Emission Zone (ULEZ) across the whole of London is ‘working better than expected’ according to new data.

A report covering the first six months of the expansion suggests that pollutant emissions in 2023 with the London-wide ULEZ expansion in place are 'dramatically lower' than compared to a scenario without it.

Within the outer London ULEZ area, nitrogen oxide (NOx) emissions from cars are estimated to be 13% lower and 7% lower from vans than a scenario without the expansion, while PM2.5 exhaust emissions from cars in outer London are estimated to be 22% lower (6% more than expected).

TfL said that across all measures, these impacts are aligned with, and in many cases greater than, what it estimated in its consultation on the expansion.

In the six-month timeframe covered by the report, roadside NO2 concentrations in outer London have dropped by up to 4.4% compared to what would have been expected without the London-wide expansion of the scheme.

The report also shows the impact of the ULEZ as a whole on roadside NO2 concentrations across London.

Levels in outer London are estimated to be 21% lower, levels in central London 53% lower and levels in inner London 24% lower.

TfL said that London’s air quality, including outer London which historically has on average had worse air quality than the rest of England, now has levels of pollution much closer to the rest of the country.

It added that compliance levels also increased further than expected, with 96.2% of all vehicles subject to the ULEZ recorded driving in London now compliant, up from 90.95% in June 2023 and 90,000 fewer non-compliant vehicles detected on an average day in February 2024.

SIGN UP
For your free daily news bulletin
Highways jobs

Planning and Highways Lawyer

Halton Borough Council
£48,738 - £51,928 plus a market supplement of £7k until December 2027
We're looking for an experienced and proactive Planning & Highways Lawyer to join our team. Reporting to the Principal Solicitor Halton, Runcorn
Recuriter: Halton Borough Council

Kinship Support Worker

Royal Borough of Greenwich
SO2 - £41,511 to £43,449
This is an excellent opportunity to become part of an experienced and skilled team working within a specialist area of Children's Services. London (Greater)
Recuriter: Royal Borough of Greenwich

Business Support Training Officer

Royal Borough of Greenwich
Scale 6 - £36,693 to £37,794
Lead on the planning, coordination and delivery of the foster carer training programme. London (Greater)
Recuriter: Royal Borough of Greenwich

AARRC Practitioner

Royal Borough of Greenwich
Career Graded Scale 5 to SO1 - £33,609 to £40,575
You will be joining a genuine value driven Children’s Service’s directorate which is rated ‘Outstanding’ by Ofsted London (Greater)
Recuriter: Royal Borough of Greenwich

Transitions Lead-School Improvement

Nottingham City Council
£53,051 – £56,293
Sitting within the School Improvement Service, you will position transition as a key driver for raising standards Nottingham, Nottinghamshire
Recuriter: Nottingham City Council
Linkedin Banner