Ellie Ames 27 November 2023

‘Worst October in history’ for pothole breakdowns

‘Worst October in history’ for pothole breakdowns image
Image: AlanMorris / Shutterstock.com

October this year was the worst on record for pothole-related breakdowns, according to the AA Pothole Index.

Last month, AA patrols attended 52,541 incidents involving wheel, tyre and suspension damage, thought to be caused by potholes.

The motoring organisation said rainfall caused by Storm Babet had contributed to the number of breakdowns, which was 12% higher than in October last year.

The total number of pothole-related breakdowns for 2023 now stands at more than half a million (510,932), averaging 1,591 a day.

AA public relations manager Tony Rich said: ‘What feels like relentless rainwater is covering and increasing the severity of potholes while holding back essential road repairs by rightly diverting roads maintenance crews to tackle fallen trees and flooded areas.

‘The £8.3bn road maintenance fund will offer some respite for drivers, but with the first instalment not being made until April 2024, the funding can’t come soon enough.

‘We are also pleased that councils will be encouraged to use the money to resurface streets rather than patch and run. Ensuring the structural integrity of the roads is key to road safety.’

Transport spokesperson for the Local Government Association, Darren Rodwell, said: ‘Investing in cost-effective and resilient roads resurfacing, rather than retrospectively dealing with potholes, is a priority for councils.’

Cllr Rodwell said the £8.3bn funding would help bring more local roads up to scratch, but warned that England faces an estimated £14bn repairs backlog.

Selling the family silver image

Selling the family silver

Ryan Swift, research fellow at IPPR North, urges the next Government to stop the mass sell off of council assets.
SIGN UP
For your free daily news bulletin
Highways jobs

Maintenance Engineer - Traffic Signals

Telent
Competitive
Reporting to the Maintenance Manager this is a great opportunity to be part of a successful and performing maintenance team, maintaining the Traffic Signals, across London. Carrying out both reactive and planned maintenance on traffic signals. England, London
Recuriter: Telent

Project Support Officer - 12 month Fixed Term Contract

Essex County Council
£26590 - £31283 per annum + +26 Days Leave & Defined Benefit Pension
Project Support OfficerFixed Term, Full TimeUp to £31,283 per annumLocation
Recuriter: Essex County Council

Part Time Pre-School / Nursery Assistant (term time only)

Essex County Council
Up to £23344 per annum + Pro Rata
Part Time Pre-School / Nursery Assistant (term time only)Permanent, Part Time£23,344 per annum, pro rata - equal to £12.10 per hourLocation
Recuriter: Essex County Council

Principal Planning Liaison Officer

Somerset Council
£39,186 to £43,421 per annum
Working in Somerset provides the opportunity to help improve lives of the people that live here Taunton, Somerset
Recuriter: Somerset Council

Community Health and Wellbeing Connector

Wakefield Council
£36,648.00 - £39,186.00, Grade 9, 37 hours, Temporary
You will work collaboratively with a range of VCSE and public sector services Wakefield, West Yorkshire
Recuriter: Wakefield Council
Linkedin Banner

Partner Content

Circular highways is a necessity not an aspiration – and it’s within our grasp

Shell is helping power the journey towards a circular paving industry with Shell Bitumen LT R, a new product for roads that uses plastics destined for landfill as part of the additives to make the bitumen.

Support from Effective Energy Group for Local Authorities to Deliver £430m Sustainable Warmth Funded Energy Efficiency Projects

Effective Energy Group is now offering its support to the 40 Local Authorities who have received a share of the £430m to deliver their projects on the ground by surveying properties and installing measures.

Pay.UK – the next step in Bacs’ evolution

Dougie Belmore explains how one of the main interfaces between you and Bacs is about to change.