Austin Macauley 23 March 2016

Report reveals £12bn road repair backlog

It will take 14 years to clear the current backlog of road repairs across England thanks to ‘decades of underfunding’, a new report has warned.

The Annual Local Authority Road Maintenance survey found the cost to get roads back to a ‘reasonable condition’ across England and Wales stands at around £12bn. Councils in England would need an extra £88m each to carry out the work and yet they are faced with an average annual carriageway maintenance budget shortfall of £5.3m.

‘The network is ageing and the cumulative effect of decades of underfunding is continuing to take its toll,’ said Alan Mackenzie, chair of the Asphalt Industry Alliance, which produces the survey.

‘Add in the impacts of flooding and increased traffic and you start to appreciate the scale of the problem our local authorities are facing.’

He praised councils for having a ‘more preventative approach’ that had allowed them to ‘work smarter with less money’. For example, the survey found the cost of fixing a single pothole as part of a planned programme was almost 18% cheaper than a reactive repair.

He added: ‘However, our roads are deteriorating at a faster rate than they can be repaired and more significant problems for the future are building unseen below the surface. It is clear that there is still not enough money available to tackle the backlog of repairs needed to get our road network back into anything approaching a reasonable condition.’

Cllr Peter Box, transport spokesman at the Local Government Association, said: ‘Local authorities are proving remarkably efficient in how they use this diminishing funding pot but they remain trapped in a frustrating cycle that will only ever leave them able to patch up our deteriorating roads.

‘Councils share the frustration of motorists having to pay to drive on roads that are often inadequate. Our polling shows that 83% of the population would support a small amount of the existing billions they pay the Treasury each year in fuel duty being reinvested to help councils bring our roads up to scratch.

‘Our roads crisis is only going to get worse unless we address it as a national priority. The Government’s own traffic projections predict a potential increase in local traffic of more than 40% by 2040. Councils desperately need long-term and consistent funding to invest in the resurfacing projects which our road network desperately needs over the next decade.’

SIGN UP
For your free daily news bulletin
Highways jobs

Senior Social Worker

Wakefield Council
£40,221.00 - £43,421.00, Grade 10, 37 hours, Permanent
Community Mental Health Senior Social worker (level two) post at Baghill House Pontefract. Baghill House, Health & Wellbeing Centre, Walkergate, Pontefract, WF9 1QW
Recuriter: Wakefield Council

Senior Social Worker

Wakefield Council
£40,221.00 - £43,421.00, Grade 10, 37 hours, Permanent
An exciting opportunity has arisen for a full time (37 hour) senior social work position within Connecting Care East. Castleford Civic Centre, Ferrybridge Road, Castleford, WF10 4JH
Recuriter: Wakefield Council

Senior Care Assistant (Days)

Wakefield Council
£21,422.43 - £23,731.62, Grade 6, 30 hours, Permanent
Dovecote lodge is a short term placement unit which support the hospital with admissions, predominantly from the emergency department. Dovecote Lodge Dovecote Lane Horbury Wakefield West Yorkshire WF4 6DJ
Recuriter: Wakefield Council

Complex Needs Support Worker

Wakefield Council
£19,697.84 - £21,064.05, Grade 5, 30 hours, Temporary
Dovecote Lodge currently has a vacancy for a 30 hour complex support worker, the rota includes days, afternoons and nights over a 10 week period. Dovecote Lodge Dovecote Lane Horbury Wakefield West Yorkshire WF4 6DJ
Recuriter: Wakefield Council

Multi Skilled Operatrive x4

Wakefield Council
£22,737.00 - £29,269.00, Career grade 3-6, 37 hours, Permanent
We are seeking enthusiastic and capable colleagues to join our Highway Operations team that forms part of the Highway Network Management. Wakefield, West Yorkshire
Recuriter: Wakefield Council
Linkedin Banner

Partner Content

Circular highways is a necessity not an aspiration – and it’s within our grasp

Shell is helping power the journey towards a circular paving industry with Shell Bitumen LT R, a new product for roads that uses plastics destined for landfill as part of the additives to make the bitumen.

Support from Effective Energy Group for Local Authorities to Deliver £430m Sustainable Warmth Funded Energy Efficiency Projects

Effective Energy Group is now offering its support to the 40 Local Authorities who have received a share of the £430m to deliver their projects on the ground by surveying properties and installing measures.

Pay.UK – the next step in Bacs’ evolution

Dougie Belmore explains how one of the main interfaces between you and Bacs is about to change.